December 9, 2004

Riser Construction Complete

I completed the riser today, as expected. It looks pretty good considering this is the first time I've ever put down carpet. After finishing the last side of the platform, I created the steps in the same manner as the platform: roofing felt on the bottom where it touches the floor, the rounded lip (only on 3 sides), carpet padding, and then carpet. Ran out of the dining room carpet leftovers, so I used the carpet leftover from covering the wall behind my refrigerator. Different pile but same color. I'll put up pictures soon.

Posted by josuah at December 9, 2004 6:27 AM UTC+00:00

Trackback Pings

TrackBack URL for this entry:
http://www.wesman.net/cgi-bin/mt/mt-tb.cgi/69

Comments

Post a comment

November 2011
Sun Mon Tue Wed Thu Fri Sat
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30      

Search

Categories

Recent Photo Posts